Usage-based maintenance makes PM due on run hours or parts made, not dates. Pick the unit, set the first interval, size the warning and keep dates where needed.

Reliability Engineering Team, IoTFlows

9 min read

Updated

You trigger maintenance from hours run or parts made by giving each task a usage meter instead of a date. The meter adds up the machine’s run hours or part count, warns the maintenance team as the total nears the task’s interval, and opens the work order when it gets there. When the job is done, a reset starts the next cycle, so every service lands after the same amount of work.

This guide is for maintenance leads moving tasks off the calendar. It covers which tasks belong on a meter, which unit to count, how to set the first interval and how early to warn.

Key takeaways

  • Usage-based maintenance makes a task due when run hours or parts made reach its interval, not on a date.
  • Put a task on a meter when the wear builds up with use and the machine’s load changes week to week.
  • Count what the wear item sees: running hours for a spindle, strokes for a die, shots for a mold.
  • Early warning time equals the run hours or parts left at the warning point, divided by daily usage.
  • Reset the meter on the day the work is done, and adjust the interval from the condition found.

What is usage-based maintenance?#

Definition

Usage-based maintenance is preventive maintenance that falls due when a machine has done a set amount of work, counted in run hours, cycles or parts made, instead of on a date. Each task carries an interval in that unit, and the running total decides when the task is owed.

It isn’t a separate strategy. NIST describes preventive maintenance as work scheduled on predetermined units, and names machine run time and cycles as the examples.[1] NASA’s reliability-centered maintenance guide defines preventive maintenance as work at predefined intervals of time, operating hours or cycles.[2]

The record that does the counting is a meter: a running total on one machine that rises with use and returns to zero only when someone resets it. A trigger point is the reading at which the task is due. The glossary entry for a meter uses the same terms.

TriggerThe task is due whenExample
CalendarA date arrivesWeekly press clutch and brake check
UsageRun hours or parts reach an intervalSpindle grease every 500 run hours
ConditionA measurement crosses a limitVibration above a set velocity

Why the calendar drifts when the load changes#

A calendar interval is a usage interval with a usage rate baked in. “Monthly” on a grease task means “about as many hours as the machine ran in a month when someone wrote the plan.” When the machine runs more or less than that, the work lands late or early.

For example, take a CNC lathe with a 250-hour grease interval, scheduled every 4 weeks on the assumption that it runs about 62.5 hours a week. Over 12 weeks, its load follows the order book.

Worked example

12 weeks on one CNC lathe, 250-hour grease interval

  • Weeks 1–4: 40, 40, 35 and 45 run hours, 160 in all.
  • Weeks 5–8: 80, 85, 80 and 75 run hours, 320 in all.
  • Weeks 9–12: 40, 20, 30 and 40 run hours, 130 in all.

On the calendar, the lathe is greased at 160 hours (64% of the interval), then at 320 hours (128%), then at 130 hours (52%). On a 250-hour meter, it is greased in week 6 and again in week 9, at 250 hours each time.

610 run hours: 3 calendar services, 2 early and 1 late; 2 meter services, both on interval
The same 12 weeks of run hours, serviced by date and by meter. Sample data.

The two early services spend labor and grease the bearing didn’t need yet. The late one runs it 70 hours past its interval in the busiest month, when a failure costs the most.

Altium Packaging met the same problem with a Slide Knife that needs inspecting every 100,000 bottles. A line that ran fast reached the count early, a slow one reached it late, and a date-based schedule was always early or overdue. How far the calendar drifts depends on how much a machine’s hours swing, which is what machine utilization measures.

Which tasks belong on a meter?#

Put a task on a meter when the wear it prevents builds up with use. NASA’s RCM guide notes that simple items subject to metal fatigue or mechanical wear, and items designed as consumables, often show a direct link between age and reliability. For those items, it says, an age limit based on operating time or stress cycles can work.[2]

Most equipment doesn’t behave that way, as how failures behave explains. In the three studies NASA summarizes, drawn from airline, Swedish and US Navy data, 77% to 92% of failures were random rather than age-related.[2]

The same guide warns that timed maintenance can be unnecessary and sometimes harmful. NIST relays an estimate from a 2016 paper that preventive maintenance is applied unnecessarily up to 50% of the time in manufacturing.[1]

A meter fixes when a task happens. It can’t make the task worth doing.

CalendarRun hoursPart countCondition
Wear builds withElapsed timeRunning timeCycles or partsNot tied to age
Machine loadSteadyVariesVaries, speed tooAny
Example taskPress clutch and brake checkSpindle or gearbox greaseDie sharpeningBearing with rising vibration
Due date known aheadYesForecast from usageForecast from usageNo

You don’t need a meter on a part that fails at random. Watch its condition instead, or let it run to failure if a breakdown costs little.

Choose what the meter counts#

Pick the wrong unit and every interval you set on it is wrong too. Count what the wear item experiences, not whatever number happens to be on the screen.

Run hours#

Decide which hours count before you set an interval. Power-on hours include a machine sitting idle between jobs; running hours count only while it works.

For wear on a spindle, a gearbox or a pump, count running hours. A Haas VF-2 left powered on through a two-hour wait for material adds two hours to its power-on clock and nothing to the spindle’s wear.

Parts, cycles and strokes#

A part count and a cycle count differ whenever one cycle makes more than one part. A four-cavity mold makes four parts per shot, but its ejector pins move once per shot. A meter counting parts reaches a shot-based interval four times too early unless you multiply the interval by the cavities.

The multiplier is the quantity per cycle. Check the count against a hand count over ten parts before you trust a meter with it. A count that reads double or half points to that multiplier, not to the sensor, as the part count troubleshooting guide explains.

Wear itemCountWhy
Spindle or gearbox greaseRunning hoursWears while turning
Coolant and way-lube filtersRunning hoursLoads while the pumps run
Stamping dieStrokesEdges dull with every hit
Mold ejector pinsShotsOne movement per shot
Bottling-line wear partBottlesWears with every bottle passed

Set the first interval#

  1. Start from the manual’s unit

    Use the interval the manufacturer gives in hours, cycles or strokes as it stands. If the manual gives both an hours limit and a time limit, keep both and do the work at whichever comes first.

  2. Convert dated tasks from measured hours

    For a task you only have as a date, take the run hours the machine averaged per period while that task kept it healthy. A monthly task on a machine that averaged 230 run hours a month becomes a 230-hour trigger point.

  3. Don’t use MTBF as the interval

    Mean time between failures (MTBF) is the average run time between breakdowns. It gives the average age at failure, not the most likely one, and says nothing about whether failures rise with age. NASA’s guide notes that MTBF is often the starting point for preventive intervals and names exactly that weakness.[2]

  4. Record the as-found condition

    At every service, have the technician note what they found: worn past the limit, borderline or like new. That record is your evidence for changing the interval.

  5. Adjust the interval in steps

    If three services in a row find the part like new, lengthen the interval one step, for example from 230 to 260 hours. If one finds it worn past the limit, shorten it. NASA calls this age exploration: adjusting a task’s interval until you know the rate at which the part’s resistance to failure declines.[2]

Warn early enough to stage the job#

A meter that acts only at 100% opens the work order the moment the task is due. That is too late when the job needs a part you don’t stock. Give the meter an early warning, and size it from how fast the machine uses up the interval.

Warning lead time (days) =

(1 − warning point) × trigger point ÷ usage per day

Worked example

An 85% warning on a 500-hour grease meter

  • Trigger point: 500 run hours. Warning at 85%: 425 run hours, which leaves 75 hours.
  • One shift, 8 run hours a day: 75 ÷ 8 = 9.4 days of warning.
  • Two shifts, 16 run hours a day: 75 ÷ 16 = 4.7 days.
  • Around the clock, 22 run hours a day: 75 ÷ 22 = 3.4 days.
With a 5-day lead time on the grease kit, the 85% warning comes too late at 16 or 22 run hours a day
The same 85% warning gives less notice the harder the machine runs. Sample data.

The same arithmetic applies to part counts, and it shrinks fast on a quick line. On a 100,000-bottle meter, the last 15% is 15,000 bottles: about 107 minutes at 140 bottles a minute, and 12.5 hours at 20 a minute. On a line that fast, the warning is a cue to stage the kit and book the stop, not to order parts.

When the warning can’t cover a part’s lead time, keep the part on the shelf instead of ordering it per job. One spare with a reorder point covers every machine that uses it.

Reset on the work, not the work order#

A meter measures the work since the last service, so the reset has to mark the service. Reset when the technician finishes the job, and date the reset to the day the work was done.

Resetting when the work order opens starts the next cycle before the grease is in. Every day the order waits in the backlog then comes out of the next interval, and nobody sees it.

Three more rules keep the count honest:

  • Reset early work too. A technician who greases the lathe at 210 hours during a changeover resets the meter then, so the next service lands 250 hours after the real one.
  • Leave skipped work unreset. The meter keeps counting past the trigger point, and the overrun records how late the job is.
  • Keep a dated task beside the meter when the manual also sets a time limit, on the same preventive maintenance schedule as your calendar work. A meter on an idle machine stops counting, and a time limit doesn’t.

Run usage-based maintenance in IoTFlows#

In Maintain, a meter counts a machine’s runtime hours or parts toward a trigger point from the machine’s own data, so nobody types a reading in. Each meter has three behaviors you switch on separately: an email at 85%, an email at the trigger point and an automatic work order at 100%.

The meter card forecasts the time left at the rate the machine has run since its last reset. A reset, which you can backdate to the day of the job, starts the next cycle. Altium Packaging inspects its Slide Knife this way, every 100,000 bottles, with the work order opened automatically.

See how to set up a meter, or how Maintain ties work orders to the machines that need them.

Before you move a task to a meter#

  • The wear the task prevents builds up with use, not with time and not at random.
  • The unit matches what the wear item sees: running hours, cycles, strokes or parts.
  • The count matches a hand count over ten parts.
  • The trigger point comes from the manual or from measured hours, never from MTBF.
  • The warning leaves more time than the job’s lead time at your busiest usage rate.
  • Resets are dated to the day the work was done, with the as-found condition recorded.
  • Any time limit from the manual or a regulation stays on a dated task.

Questions#

What is the difference between usage-based and condition-based maintenance?#

Usage-based maintenance makes a task due when the machine has run a set number of hours or made a set number of parts, whatever state the part is in. Condition-based maintenance makes it due when a measurement, such as vibration or temperature, crosses a limit. Use usage for wear that tracks the work done, and condition for failures that give a measurable warning first.

Is usage-based maintenance a kind of preventive maintenance?#

Yes. The task is planned in advance and done whether or not the part shows wear, which is what makes it preventive. Only the clock changes, from the date to the hours the machine ran or the parts it made. NIST and NASA both list run time and cycles as ways to schedule preventive work.

How do I convert a monthly PM into a run-hour interval?#

Take the run hours the machine averaged per month over a period when the monthly task kept it healthy, and use that figure as the trigger point. A machine that averaged 230 run hours a month gets a 230-hour trigger. Then lengthen or shorten it in steps from the condition the technician records at each service.

What happens to a usage meter when the machine sits idle?#

It stops counting, so the task stops coming due. That is correct for wear that only happens while the machine runs. If the manual also sets a time limit, or a regulation dates the inspection, keep a calendar task beside the meter and do the work at whichever comes due first.

Should a meter count parts or machine cycles?#

Count whatever the wear item experiences. The ejector pins on a four-cavity mold move once per shot, while a trimmer downstream handles every part. If the meter counts parts but the interval was written in shots, multiply the interval by the cavity count, or the task comes due four times too early.

Written by

Reliability Engineering Team, IoTFlows

Sources#

  1. The Costs and Benefits of Advanced Maintenance in Manufacturing (NIST AMS 100-18), National Institute of Standards and Technology, D. Thomas, April 2018. Accessed Oct 16, 2026
    doi.org/10.6028/NIST.AMS.100-18
  2. Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment, National Aeronautics and Space Administration, September 2008. Accessed Oct 16, 2026
    nasa.gov/wp-content/uploads/2023/06/nasa-rcmguide.pdf
  3. 29 CFR 1910.217, Mechanical power presses, Occupational Safety and Health Administration. Accessed Oct 16, 2026
    osha.gov/laws-regs/regulations/standardnumber/1910/1910.217